The Chicago Tunnel Company built a unique freight tunnel network under the downtown of the city of Chicago. It inspired the construction of the London Post Office Railway.

History

Construction of the subway began in 1899, and the full system with a tunnel under almost every street of downtown Chicago was finished in 1906. Six feet wide by seven and a half high (1.8 by 2.3 metres) tunnels were officially constructed to house only telephone cables, but the Illinois Tunnel Company also secretly installed two foot gauge railroad tracks in the tunnels.

Land reclamation

Excavations from tunnel construction were used to fill in Lake Michigan to create land for:

Experiment

First test trains were run a few years after the start of construction, in which locomotives received power from a third rail cog which was situated in a slot between the two running rails, but later it was decided to change the third rail to overhead lines. Tunnel freight cars were delivered to railroad freight stations, warehouses, office buildings, and store buildings via elevators or direct access.

Operation

In 1912, the Illinois Tunnel Company, descendant of Illinois Telephone and Telegraph Company was reorganized and renamed the Chicago Tunnel Company, and all of the telephone cables were removed from the tunnels. Through the years, the system expanded to approximately 60 miles (97 km) of track, with 149 four wheeled electric locomotives, and over 3000 freight cars in service. Trucks stole away significant amounts of business, and by the late 1940s, customers began to switch from coal to natural gas to heat their buildings. The ones that kept burning coal switched to delivery by truck because unloading from the surface was easier, and a complex conveyor system wasn't required.
   Even though coal deliveries were made with trucks, it was still more efficient to remove ashes by tunnel. This basically left the company in the ash removal business for the last ten years of operation.

Closure

Chicago Tunnel Company was declared bankrupt in 1956, the network was closed and abandoned in the summer of 1959. The scrappers removed almost all of the overhead wire and elevators; locomotives and steel freight cars were removed and scrapped as well.

Disaster

» See also: Chicago Flood

In 1991 near the Kinzie Street bridge, a new set of pilings (collectively known as a "dolphin") were driven into the riverbed to prevent barges from bumping into the bridge. As the pillars were installed, a miscalculation was made that caused severe damage to the tunnel directly below the river.
   In 1992, a cable television employee in the tunnel underneath the Chicago River videotaped mud and water oozing in where the bottom of the wooden pilings had penetrated the tunnel's roof. Official response was slow; no emergency measures were deemed necessary, and a formal bidding process began for the contract to repair the damage. But in April, a large hole formed in the roof of the tunnel causing the river and huge amounts of mud to pour in. The entire system was quickly flooded in what became known as the Chicago Flood, including many skyscraper basements that were still connected to it, causing severe property damage and disrupting utility service throughout the Loop. Many businesses had no idea that they were still connected to the tunnel complex as the openings were boarded up, bricked up, or otherwise closed off - but not waterproof. The accident shut down the entire downtown area for days, causing considerable economic losses. The insurance battles lasted for years, the central point being the definition of the accident, for example whether it was a "flood" or a "leak." Leaks were covered by insurance, while floods were not. Eventually it was classified a leak, which is why many residents still call it the "Great Chicago Leak."
   At that point, government agencies belatedly responded. The leak was stopped and the tunnels of water were emptied within days (at great cost). The tunnels are still used for power and communication cables. They have been popular with urban exploration groups who sometimes sneak in to have a look around, but after a terrorism scare in the early 2000s involving a deranged former Chicago Urban Exploration member, all access to the tunnels has been secured.

Further Information

Get more info on 'Chicago Tunnel Company'.


External Link Exchanges

Do you know how hard it is to get a link from a large encyclopaedia? Well we're different and will prove it. To get a link from us just add the following HTML to your site on a relevant page:

    <a href="http://chicago_tunnel_company.totallyexplained.com">Chicago Tunnel Company Totally Explained</a>

Then simply click through this link from your web page. Our crawlers will verify your link, extract the title of your web page and instantly add a link back to it. If you like you can remove the words Totally Explained and embed the link in article text.
   As long as your link remains in place, we'll keep our link to you right here. Please play fair - our crawlers are watching. Your site must be closely related to this one's topic. Any kind of spamming, dubious practises or removing the link will result in your link from us being dropped and, potentially, your whole site being banned.



Copyright © 2007-8 totallyexplained.com | Licensed under the GNU Free Documentation License | Site Map
This article contains text from the Wikipedia article Chicago Tunnel Company (History) and is released under the GFDL | RSS Version